Cylindrical bags, 27” or 30” diameter, are secured to the mine roof and are subsequently filled with a foamed cement.
The installation of the TekCrib system is accomplished by using the Minova TekPlacer unit, specially designed to combine the TekCrib powder with air and water, producing a cementitious foam.
The foam is typically pumped a distance of 1,000 ft., although much longer distances are possible, especially when pumping down surface boreholes. The mix begins to gel within minutes of discharge and cures to a final strength, ranging from approximately 400-800 psi.